Test and Maintenance
AP.TM: Do you have DRP testing and maintenance procedures in place?
  • You provide information and a schedule for the testing of the system
  • You review and test all DRPs at regular intervals (e.g., yearly)
  • You document the test results and improve the DRP
CMMI Maturity Level
Description

All ISCPs should be reviewed and tested at the organization defined frequency (e.g. yearly) or whenever there is a significant change to the system. Provide information and a schedule for the testing of the system. For low-impact systems, a yearly tabletop exercise is sufficient. The tabletop exercise should include all ISCP points of contact, and be conducted by an outside or impartial observer. A formal test plan is developed prior to the tabletop, and an exercise and questions are developed to include key sections of the ISCP, including a walk-through of the following:

  • Notification procedures;
  • System recovery on an alternate platform from backup media;
  • Internal and external connectivity; and
  • Reconstitution procedures. Results of the test are documented in an After Action Report, and Lessons Learned are developed for updating information in the ISCP.