SAMMY UI is optimized for resolutions with a width 1024px and higher.
Associated Documentation
AP.AD: Are there supporting documents available and linked to this plan?
  • You keep reference architecture diagrams and any other relevant documents linked to the plan
  • You keep the detailed recovery procedures linked to the plan
CMMI Maturity Level
Not Applicable - Not applicable
Level 1: Initial - Unpredictable and reactive. Work gets completed but is often delayed and over budget.
Level 2: Managed - Managed on the project level. Projects are planned, performed, measured, and controlled.
Level 3: Defined - Proactive, rather than reactive. Organization-wide standards provide guidance across projects, programs, and portfolios.
Level 4: Quantitatively Managed - Measured and controlled. Organization is data-driven with quantitative performance improvement objectives that are predictable and align to meet the needs of internal and external stakeholders.
Level 5: Optimized - Stable and flexible. Organization is focused on continuous improvement and is built to pivot and respond to opportunity and change. The organization’s stability provides a platform for agility and innovation.
Description

Information for this section should be available from the system’s System Security Plan (SSP) and can be copied from the SSP, or reference the applicable section in the SSP and attach the latest version of the SSP to this contingency plan. ISCPs for other systems that either interconnect or support the system should be identified in this appendix. The most current version of the ISCP, location of ISCP, and primary point of contact (such as the ISCP Coordinator) should be noted.