SAMMY UI is optimized for resolutions with a width 1024px and higher.
Maturity Level 2
Maturity Level 3
PR.IP-2.1
PR.IP-2.1: The system and application development life cycle shall include security considerations.
  • System and application development life cycle should include the acquisition process of the organization's business critical systems and its components.
  • Vulnerability awareness and prevention training for (web application) developers, and advanced social engineering awareness training for high-profile roles should be considered.
  • When hosting internet facing applications the implementation of a web application firewall (WAF) should be considered.
Documentation Maturity
Not applicable - Not applicable in the selected scope.
Level 1 - Initial - No Process documentation or not formally approved by management.
Level 2 - Repeatable - Formally approved Process documentation exists but not reviewed in the previous 2 years.
Level 3 - Defined - Formally approved Process documentation exists, and exceptions are documented and approved. Documented and approved exceptions < 5% of the time.
Level 4 - Managed - Formally approved Process documentation exists, and exceptions are documented and approved. Documented and approved exceptions < 3% of the time.
Level 5 - Optimizing - Formally approved Process documentation exists, and exceptions are documented and approved. Documented and approved exceptions < 0,5% of the time.
Implementation Maturity
Not applicable - Not applicable in the selected scope.
Level 1 - Initial - Standard process does not exist.
Level 2 - Repeatable - Ad-hoc process exists and is done informally.
Level 3 - Defined - Formal process exists and is implemented. Evidence available for most activities. Less than 10% process exceptions.
Level 4 - Managed - Formal process exists and is implemented. Evidence available for all activities. Detailed metrics of the process are captured and reported. Minimal target for metrics has been established. Less than 5% of process exceptions.
Level 5 - Optimizing - Formal process exists and is implemented. Evidence available for all activities. Detailed metrics of the process are captured and reported. Minimal target for metrics has been established and continually improving. Less than 1% of process exceptions.
Description

The system and application development life cycle shall include security considerations.