SAMMY UI is optimized for resolutions with a width 1024px and higher.
DE.AE-1.1
DE.AE-1.1: The organization shall ensure that a baseline of network operations and expected data flows for its critical systems is developed, documented and maintained to track events.
  • Consider enabling local logging on all your systems and network devices and keep them for a certain period, for example up to 6 months.
  • Ensure that your logs contain enough information (source, date, user, timestamp, etc.) and that you have enough storage space for their generation.
  • Consider centralizing your logs.
  • Consider deploying a Security Information and Event Management tool (SIEM) that will facilitate the correlation and analysis of your data.
Documentation Maturity
Not applicable - Not applicable in the selected scope.
Level 1 - Initial - No Process documentation or not formally approved by management.
Level 2 - Repeatable - Formally approved Process documentation exists but not reviewed in the previous 2 years.
Level 3 - Defined - Formally approved Process documentation exists, and exceptions are documented and approved. Documented and approved exceptions < 5% of the time.
Level 4 - Managed - Formally approved Process documentation exists, and exceptions are documented and approved. Documented and approved exceptions < 3% of the time.
Level 5 - Optimizing - Formally approved Process documentation exists, and exceptions are documented and approved. Documented and approved exceptions < 0,5% of the time.
Implementation Maturity
Not applicable - Not applicable in the selected scope.
Level 1 - Initial - Standard process does not exist.
Level 2 - Repeatable - Ad-hoc process exists and is done informally.
Level 3 - Defined - Formal process exists and is implemented. Evidence available for most activities. Less than 10% process exceptions.
Level 4 - Managed - Formal process exists and is implemented. Evidence available for all activities. Detailed metrics of the process are captured and reported. Minimal target for metrics has been established. Less than 5% of process exceptions.
Level 5 - Optimizing - Formal process exists and is implemented. Evidence available for all activities. Detailed metrics of the process are captured and reported. Minimal target for metrics has been established and continually improving. Less than 1% of process exceptions.
Description

The organization shall ensure that a baseline of network operations and expected data flows for its critical systems is developed, documented and maintained to track events.